Melton Hill Lock
Operated by the U.S. Army Corps of Engineers

Bobby Benson from the Corps of Engineers demonstrated
the operation of the lock at Melton Hill Dam.

 

 

 

 

 

This facility enables commerce to be transported by barge on the Clinch River all the way to Clinton, TN.

Click on image to enlarge

vcmel3.JPG (20794 bytes)Utility tunnel below lake level

vcmel4.JPG (18625 bytes)

Alicia, Sean, Nic, Ryan and Brandon receiving training from Bobby Benson on the operation of the lock.

vcmel5.JPG (22272 bytes)

vcmel6.JPG (23806 bytes)

vcmel7.JPG (26811 bytes)

vcmel8.JPG (30283 bytes)

vcmel9.JPG (22977 bytes)Upstream gate being opened vcmel10.JPG (18112 bytes)Boat entering lock from Melton Hill Lake
vcmel11.JPG (21338 bytes)After entering lock, the upstream gate is closed and a horn is sounded to warn downstream boaters to leave the area. vcmel12.JPG (23110 bytes)Water is then drained from the lock into Watts Bar Lake (downstream of Melton Hill Dam).
vcmel14.JPG (23020 bytes)After the lock is drained by gravity flow, the lower gate is opened. vcmel16.JPG (21947 bytes)Boat leaving Melton Hill Lock and entering Watts Bar Lake which is 57 feet in elevation below Melton Hill Lake.
vcmel15.JPG (27739 bytes)Group shot during the tour.

After the boat left the lock, the lower gate was closed and the water level in the lock was raised about 10 feet above lower lake level.  A partially filled lock reduces the water pressure on the upper gate.  It also applies pressure to the lower gate to reduce the risk of damage from downstream wave action while the lock is inactive.

We also learned that the Panama Canal is not really a canal, but a series of lakes and locks.  This same method that we observed at Melton Hill is used to transport commerce over the mountains of Panama between the Atlantic and Pacific Oceans.

Welcome

Members Wanted

Agenda for Kick-off Meeting, Saturday, October 20, 2001

Schedule of Meetings for 2001 -- 2002

 

Summary of Previous Meetings:
(Schedule)

Meeting Hosted by Geo/Environmental Associates (October 2000)

Meeting Hosted by City of Knoxville
Engineering Department  (November 2000)

Meeting Hosted by TVA  (December 2000)

Meeting Hosted by Jacobs  (January 2000)

Meeting Hosted by
University of Tennessee ASCE Student Chapter (February 2001)

Meeting Hosted by Wilbur Smith and Associates (March 2001)

Coal Creek Watershed Community Service (April 2001)

Meeting Hosted by U.S. Army Corps of Engineers (May 2001)

Meeting Hosted by the Knoxville Utilities Board (June 2001)

Meeting hosted by Geo/Environmental Associates (October 2001)

Meeting hosted by City of Knoxville Traffic Engineering (Nov 2001)

Meeting hosted by Knoxville Convention Center (February 2002)

 

 

[Home] [Staff] [Special Projects] [Technical Publications]
 [Technical Awards & Events] [Staff Awards & Accomplishments]
[Corporate Philosophy] [Client Survey]
[Contact Us] [Explorers Post] [Map to our Office]
Copyright© Geo/Environmental Associates, Inc. 1995 through 2008